Opportunity

    • satheesh VS is looking for Career Opportunities/Job as Body in white

      07 Aug 2015 09:23:51

      Industry: Automotive
      Profession: Designer
      Skills: Catia V5 BIW
      Experience Required: 7
      Employment Type: FullTime

      • Mechanical Engineer over 7.0 years of experience in design and development of
      automotive projects.
      • Design and development of BIW/Under body structure sheet metal parts.
      • Knowledge of BIW advanced sheet metal joining techniques.
      • Product design & development of BIW parts with the help of DFM/ DFA/
      DFS/CAE/Physical testing.
      • Good knowledge in sheet metal fabrication and GD&T
      • Document Preparation like CFR, ECR & DFMEA, VA&VE
      • Co- Ordination with internal departments
      • Involved designing of sub system and components level of designing of various
      BIW components like
      a. Longitudinal extension long rear sleeper,
      b. Cross member NVH,
      c. Cross member rear floor extension,
      d. Floor extension longitudinal reinf,
      e. Sill inner extension long rear sleeper.
      • Updating existing CAD models by making new proposals and checking Section
      feasibility
      • Making different proposals to improve in design of concept generation.
      • Design changes in BIW components based on ECR.
      • Generating Own and Benchmarking concept design and validating in Proto
      • Project Planning and Execution.
      • Generating Detail drawings and applying GD&T for different stages of BIW parts
      and assemblies
      • Interact with stylish/CAE group to optimize the BIW design.
      • Modifying the design based on Durability/vehicle trials
      • Design and development spot weld plan for complete WSL cab and validate in
      proto builds.
      Project 1: Floor extension longitudinal reinf (floor extension failure (WSH, WSM, WSL & WIM)
      Contribution : (CAE failure, Six poster test failure)
      Rectified the floor extension failure (crack) due to vibration at six poster test. The actual root cause was sorted out from problem. The CFR (component failure report) has been closed by Adding additional longitudinal reinf bkt middle floor extension area to overcome the issue which has overcome the CAE & six posters Failure.
      Project 2 : Cab tilt mounting bkt reinf (cab tilt mounting bkt failure WDL, WSH, WSM, WSL, WIM)
      Contribution : (CAE failure, Six poster test failure)
      Rectified the cab tilt mounting bkt failure (crack) due to vibration at six poster test. The actual root cause was sorted out from problem. The CFR (component failure report) has been closed by Adding additional reinforcement bkt middle cab tilt mounting bkt area to overcome the issue which has overcome the CAE & six poster Failure.

© 2014-2015 All Rights Reserved, Cocult
Follow Us: